1. <em id="h4ymp"><span id="h4ymp"></span></em>
      <form id="h4ymp"></form>

        <em id="h4ymp"><span id="h4ymp"></span></em>

          1. <em id="h4ymp"><span id="h4ymp"><track id="h4ymp"></track></span></em>
              <sub id="h4ymp"></sub>
              Industrial Chain

              Engineering

            1. Engineers
              100+

              Design Software
              Autodesk AutoCAD 2018
              PTC CREO Essentials
              UG 12.0(NX12.0)

            2. NPI:
              2-4 weeks

            3. KAT:
              For Key Customers

            4. Lab:
              Equipped Internally

            5. Patents:
              130+ (as of 2022)

            6. Market demand-oriented
              Technical innovation-driven

            7. New Product Development Process
              Customer Requirement Defined
              • Specs
              • Application
              • Special Feature
              • Test Requirement

              Team Set Up
              Project Plan
              • Team member
              • Feasibility Study
              • Time, Cost and Delivery Review
              Product Design
              FEA
              Validation
              • DFMEA
              • Product Design
              • FEA
              • PVT & R
              • Freeze design
              Process Design
              Verification
              • SOP
              • Workstation & Fixtures
              • Material
              • PFMEA
              • DVT
              Feedback Assessment
              CA
              • Pilot Run
              • MSA
              • Run@Rate
              • Package and Logistics
              • PPAP Preparation
              PPAP
              • PPAP Submission
              • Customer Approval

              Manufacturing

              Marketing

              2016-2020    Annual Sales


              Market Segment

              Product Segment

              • 20%

                  Precision Components


              • 45%

                  Modules/Encoders/Potentiometers/Switches


              • 35%

                  Connectors and Cable Assemblies


              Operations

              3 Core Values to Assure Customer Satisfaction:

              • 1

                Speedy turn around to all customer needs On-time delivery is one of our highest priorities at LJV;

              • 2

                Lean-manufacturing offering competitive products to meet with market and customer needs High quality requirement with strict  goal in QA, QC and QS;

              • 3

                Go extra steps to support strategic customers in super urgent demands as well as costs where needed Market and customer oriented – Flexible operation model to ensure customer satisfaction is met.

              Critical Process Control

              • DFMEA
                Process Capability Study
                Product Quality Plan
              • Process Sample Approval (PSA)
                PFMEA
                Statistical Process Control (SPC)
                Serial Process Verification Run, Significant Process Run (SPVR, SPR)
                Pilot Run/ Mass-Production Verification Test (MVT)
              • PPAP

              Customers

              欧美综合天天夜夜夜久久,一级黄片免费视频,国产性爱精品久久久,亚洲欧美AⅤ在线资源 ,99精品国产九九国产精品 精品久久久久久精品视频 国产精品国产三级国产专播 亚洲精品国产自在久久 国产免费91 亚洲精品国产自在久久 天天怕亚洲 97久久超碰亚洲视觉盛宴 久久精品国产欧美一区 在线欧美精品视频在线观看 一级做a爱过程免费视频麻豆